The Wigan Residual Waste Treatment project comprises the construction of several household waste recycling centres and related infrastructure, capable of processing around 100,000 tonnes of residual waste per annum.

The project is being procured by the Wigan Borough Council, with the sites in the north west of England, a few miles west of Manchester.

Operis completed a formal model audit for Viridor Waste Management, prior to the submission of bids on February 21, 2014.

Share now

CONTACT US

Please get in touch with either of our regional offices.

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2025/01/Operis_portrait-7555-1-scaled-500x500.jpg
James Jones
Director

+44 207 562 0492

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2022/11/22_09_Holly-0555.jpg
Holly Eveleigh
Director

+44 20 7562 0457

[javascript protected email address]

Operis Europe

View Google Map
+44 207 562 0400
[javascript protected email address]

Operis North America

View Google Map
+1 647 846 7382
[javascript protected email address]

CONTACT US

Discuss your requirements with us

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
This field is for validation purposes and should be left unchanged.
Name(Required)