Operis assisted the University of Toronto with Project Leap by providing a formal model audit prior to financial close.

Project Leap will cut St. George campus carbon emissions in half by 2027, accelerating U of T’s journey to becoming climate positive. Project Leap involves deep energy retrofits of several energy-intensive buildings, replacing natural gas with electricity for heating, integrating with U of T’s newly built geoexchange system, and extensive LED lighting retrofits.

The $138 million project is being jointly funded by U of T, the Canada Infrastructure Bank, and the Royal Bank of Canada, and has received grants from Environment and Climate Change Canada (ECCC) and the Independent Electricity System Operator (IESO).

Operis is pleased to have provided support for this exciting project and we extend our congratulations to all parties involved in its successful launch.

Share now

CONTACT US

Please get in touch with either of our regional offices.

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2025/01/Operis_portrait-7555-1-scaled-500x500.jpg
James Jones
Director

+44 207 562 0492

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2022/11/22_09_Holly-0555.jpg
Holly Eveleigh
Director

+44 20 7562 0457

[javascript protected email address]

Operis Europe

View Google Map
+44 207 562 0400
[javascript protected email address]

Operis North America

View Google Map
+1 647 846 7382
[javascript protected email address]

CONTACT US

Discuss your requirements with us

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
This field is for validation purposes and should be left unchanged.
Name(Required)