On November 21, 2019, a consortium consisting of Marubeni and Total Solar submitted their bid to the Emirates Water and Electricity Company (EWEC) for the financing, construction, operation and maintenance of a 2GW solar PV plant in Abu Dhabi’s Al Dhafra region.

This project is integral to the UAE’s sustainable generation program, which aims to increase the clean energy mix in power generation as outlined in the UAE Energy Strategy 2050. The solar plant will provide electricity to over 110,000 households across the UAE and reduce 1.5 million metric tonnes of CO2 emissions per year.

Operis was pleased to perform an audit of the bid stage financial model.

Share now

CONTACT US

Please get in touch with either of our regional offices.

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Director

+44 207 562 0433

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2021/03/Jun-Tao-500x500.png
Jun Tao
Director

+44 207 562 0428

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2021/04/019A5891_Michael.jpg
Michael Jarman
Director

+1 647 243 8016

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2021/05/Philip-Allen-500x500.jpg
Philip Allen
Head of Training [javascript protected email address]

Operis Europe

View Google Map
+44 207 562 0400
[javascript protected email address]

Operis North America

View Google Map
+1 647 846 7382
[javascript protected email address]

CONTACT US

Discuss your requirements with us

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Director

+44 207 562 0433

[javascript protected email address]
Name(Required)
This field is for validation purposes and should be left unchanged.