OnPath Energy reached financial close in the raising of a term loan debt facility to finance the construction of Mill Rig Wind Farm on 30 July 2025. The project marks a significant step in the company’s mission to power a more sustainable future through renewable energy.

The wind farm, with a capacity of 33.4MW, will produce enough electricity to supply more than 45,000 homes. Located near Darvel, it is expected to be completed in early 2026 and will have an operational life of 30 years.

Operis developed the financial model used for the transaction, while a separate and independent team at Operis conducted a full audit of the model for the senior lender.

Share now

CONTACT US

Please get in touch with either of our regional offices.

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2025/01/Operis_portrait-7555-1-scaled-500x500.jpg
James Jones
Director

+44 207 562 0492

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2022/11/22_09_Holly-0555.jpg
Holly Eveleigh
Director

+44 20 7562 0457

[javascript protected email address]

Operis Europe

View Google Map
+44 207 562 0400
[javascript protected email address]

Operis North America

View Google Map
+1 647 846 7382
[javascript protected email address]

CONTACT US

Discuss your requirements with us

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
This field is for validation purposes and should be left unchanged.
Name(Required)