In August 2025, Rock Rail and Infracapital secured financing for a new battery-electric train fleet for the Mittelthüringer Akku-Netz network in Thuringia, Germany.

The project will provide 19 Stadler FLIRT Akku battery-electric multiple units which will replace end-of-life diesel trains on key routes in central Germany. The new fleet will enter service in December 2028 and will cover around 3.6 million train kilometres each year.

The new vehicles allow electric trains to be operated on non-electrified lines. This supports the state’s local transportation network electrification and is a major step towards decarbonising regional rail in Germany.

Operis acted as modelling advisor to the sponsors, from the initial model build to running equity and lender scenarios through to managing the model audit process and financial close. An independent team at Operis acted as model auditor.

Share now

CONTACT US

Please get in touch with either of our regional offices.

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2025/01/Operis_portrait-7555-1-scaled-500x500.jpg
James Jones
Director

+44 207 562 0492

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2022/11/22_09_Holly-0555.jpg
Holly Eveleigh
Director

+44 20 7562 0457

[javascript protected email address]

Operis Europe

View Google Map
+44 207 562 0400
[javascript protected email address]

Operis North America

View Google Map
+1 647 846 7382
[javascript protected email address]

CONTACT US

Discuss your requirements with us

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
This field is for validation purposes and should be left unchanged.
Name(Required)