Operis supported Axium Infrastructure in acquiring a 50% equity interest in the 100 MW Cedar Point II Wind Project from Fiera Infrastructure Inc. by providing a high-level review of its financial model. The wind farm, located in Ontario, supplies 100% of its power to the Independent Electricity System Operator (IESO) under a 20-year Feed-in-Tariff (FiT) Power Purchase Agreement (PPA).

This acquisition highlights Axium’s dedication to expanding its renewable energy portfolio across North America. Operis is pleased to continue its collaboration with Axium on projects that drive growth and innovation.

Operis congratulates all parties involved and looks forward to supporting Axium in future endeavors.

Share now

CONTACT US

Please get in touch with either of our regional offices.

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2025/01/Operis_portrait-7555-1-scaled-500x500.jpg
James Jones
Director

+44 207 562 0492

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2022/11/22_09_Holly-0555.jpg
Holly Eveleigh
Director

+44 20 7562 0457

[javascript protected email address]

Operis Europe

View Google Map
+44 207 562 0400
[javascript protected email address]

Operis North America

View Google Map
+1 647 846 7382
[javascript protected email address]

CONTACT US

Discuss your requirements with us

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
This field is for validation purposes and should be left unchanged.
Name(Required)