This project comprises the design, build, financing and operation of an organic waste treatment plant in Cardiff, Wales. This facility and the overall procurement forms part of the Welsh Government’s ‘Towards Zero Waste’ initiative, a framework for resource efficiency and waste management to run between now and 2050.

The dedicated recycling facility, planned to be operational by 2016, will be capable of receiving around 35,000 tonnes of food waste per year, which is collected by Cardiff Council over the next 15 years.

Operis provided a high level review of the financial model prior to bid submission stage, with a full audit to follow if Kelda are awarded preferred bidder.

Share now

CONTACT US

Please get in touch with either of our regional offices.

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Director

+44 207 562 0433

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2021/03/Jun-Tao-500x500.png
Jun Tao
Director

+44 207 562 0428

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2021/04/019A5891_Michael.jpg
Michael Jarman
Director

+1 647 243 8016

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2021/05/Philip-Allen-500x500.jpg
Philip Allen
Head of Training [javascript protected email address]

Operis Europe

View Google Map
+44 207 562 0400
[javascript protected email address]

Operis North America

View Google Map
+1 647 846 7382
[javascript protected email address]

CONTACT US

Discuss your requirements with us

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Director

+44 207 562 0433

[javascript protected email address]
Name(Required)
This field is for validation purposes and should be left unchanged.