Operis was contracted to review the Coentunnel Operating model.  Operis audited the financial model at financial close stage in 2008, since then the model has been converted to an operating model.

The Coentunnel Company started working on the renovation of the first Coentunnel, the build of the second Coentunnel and the connections to the A8 and A10 motorways in July 2008. The consortium is also responsible for the new construction and renovation of thirty-six fly-overs and bridges and for the maintenance of the project until the end of the concession in 2037.

Operis conducted the review on behalf of the SPV and the lenders.

Share now

CONTACT US

Please get in touch with either of our regional offices.

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Director

+44 207 562 0433

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2021/03/Jun-Tao-500x500.png
Jun Tao
Director

+44 207 562 0428

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2021/04/019A5891_Michael.jpg
Michael Jarman
Director

+1 647 243 8016

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2021/05/Philip-Allen-500x500.jpg
Philip Allen
Head of Training [javascript protected email address]

Operis Europe

View Google Map
+44 207 562 0400
[javascript protected email address]

Operis North America

View Google Map
+1 647 846 7382
[javascript protected email address]

CONTACT US

Discuss your requirements with us

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Director

+44 207 562 0433

[javascript protected email address]
Name(Required)
This field is for validation purposes and should be left unchanged.