Viridor are approaching the end of construction of their state of the art Energy from Waste site in Oxfordshire, England.

Having successfully synchronised with the National Grid, one of the final steps to be put in place before the site becomes fully operational later this year, the site will process around 300,000 tonnes of non-hazardous, post recycling, residual waste. Once operational, the plant will export enough electricity to power around 38,000 homes and hopes to increase the amount of total waste recycled in Oxfordshire by 38%.

To support Viridor’s ongoing operations, Operis were pleased to undertake a full audit of their operating model.

Share now

CONTACT US

Please get in touch with either of our regional offices.

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2025/01/Operis_portrait-7555-1-scaled-500x500.jpg
James Jones
Director

+44 207 562 0492

[javascript protected email address]
https://www.operis.com/wp-content/uploads/2022/11/22_09_Holly-0555.jpg
Holly Eveleigh
Director

+44 20 7562 0457

[javascript protected email address]

Operis Europe

View Google Map
+44 207 562 0400
[javascript protected email address]

Operis North America

View Google Map
+1 647 846 7382
[javascript protected email address]

CONTACT US

Discuss your requirements with us

https://www.operis.com/wp-content/uploads/2022/11/22_09_Chris_A-0376.jpg
Chris Aldred
Head of Advisory

+44 207 562 0433

[javascript protected email address]
This field is for validation purposes and should be left unchanged.
Name(Required)